MMD MUMBAI
date 02 may 2014
External:Mr.Waad
Internal:Mr.Orion
Function and 4
date 02 may 2014
External:Mr.Waad
Internal:Mr.Orion
Function and 4
Function 3
Click on the questions for the answers
1)which types of ships u sailed....tanker and bulk carrier....so draw the mid ship sections of tanker and bulker.
2)Constructional difference between bulk carrier and tanker.water ingress detection system..explain the requirements for high density cargo(grain) ?
3)Duct keel from where to where and why..is there a chance that bunker fuel gets mixed up with water..if so any precaution
4)IOPP certificate contents...he agrees for any answer...but ultimatey needs specific answer ...tat is segregated ballast tank capacity..
Weekly entries in ORB
5)IAPP certificate validity...ODS Record...what chief engineer enters in ODS record...What is VOC plan...regulation regarding VOC..
6)Cargo Pump room gas detection system.
7)Sounding pipe and vent pipe specialities.
8)Standard discharge connection,international shore coupling diagram,with dimension..what about the gasket ...thickness and pressure
9)What we do with soot collection tank...if full.
10)Marpol special areas...annex 1,4and 5..write down all...
Click on the questions for the answers
1)which types of ships u sailed....tanker and bulk carrier....so draw the mid ship sections of tanker and bulker.
2)Constructional difference between bulk carrier and tanker.water ingress detection system..explain the requirements for high density cargo(grain) ?
3)Duct keel from where to where and why..is there a chance that bunker fuel gets mixed up with water..if so any precaution
4)IOPP certificate contents...he agrees for any answer...but ultimatey needs specific answer ...tat is segregated ballast tank capacity..
Weekly entries in ORB
5)IAPP certificate validity...ODS Record...what chief engineer enters in ODS record...What is VOC plan...regulation regarding VOC..
6)Cargo Pump room gas detection system.
7)Sounding pipe and vent pipe specialities.
8)Standard discharge connection,international shore coupling diagram,with dimension..what about the gasket ...thickness and pressure
9)What we do with soot collection tank...if full.
10)Marpol special areas...annex 1,4and 5..write down all...
Function 4
1)Boiler Furnace drain...what we do with it..why wash the furnace side...won't it affect the refractory strength..if so why it is done.
2)Turbo charger grit washing procedure..
3)VIT super VIT comparison...what is the case if m/e booster pump is not working...recirculation line for fuel...why provided..how suction valve operate in fuel pump.
4)Purifier interference line...how to set it...show position of gravity disc in diagram..what if fuel density is smaller,what about size of gravity disc and you don't have any suitable gravity disc.any other ways...effect of water pressure in setting interface.
5)Unloader not working.how to run compressor.
1)Boiler Furnace drain...what we do with it..why wash the furnace side...won't it affect the refractory strength..if so why it is done.
2)Turbo charger grit washing procedure..
3)VIT super VIT comparison...what is the case if m/e booster pump is not working...recirculation line for fuel...why provided..how suction valve operate in fuel pump.
4)Purifier interference line...how to set it...show position of gravity disc in diagram..what if fuel density is smaller,what about size of gravity disc and you don't have any suitable gravity disc.any other ways...effect of water pressure in setting interface.
5)Unloader not working.how to run compressor.
No comments:
Post a Comment